Modern Elegance on this single floor Alaska Tiny Home.
Starting Price $125,000








| Items | Description |
|---|---|
| Blueprints / Design – Labor | Flat Rate Blueprint Fee $2,000.00 – no charge for using current plans with no changes |
| Chassis – Materials | 8.6′ Wide X 35′ ft long Custom Chassis |
| Chassis – Labor | Transport custom built Chassis to manufacturing plant. Brake and light wiring. Arrival at plant inspection and pre transport axle and wheel inspection. |
| Framing – Materials | Underfloor, Exterior Walls, Interior Walls, Roof, Sheathing |
| Framing – Labor | Framing |
| Insulation – Materials | Reflective insulation material added to floor, walls and roof as additional R factor with added benefits of longer Heat/Cooling retention |
| Insulation – Materials | Insulation for exterior walls, roof, interior walls and floor |
| Insulation – Labor | Insulate sub floor, exterior walls, roof and all interior walls |
| Electrical – Materials | Electrical panel, wire, switches, LED lights, Olympus Maestro AC/Heat, Exterior 50 amp outlet, interior outlets, GFCI and usb outlets |
| Electrical – Labor | Rough Electrical and Finish Electrical |
| HVAC – Materials | HRV Unit |
| HVAC – Labor | Installing AC/Heater unit in home, venting and setting up |
| Plumbing – Materials | Shower valve, toilet, sewer outlet, water inlet, shower, bathroom sink, kitchen sink, washer/dryer box, water heater |
| Plumbing – Labor | Rough and finish plumbing |
| Appliances | Refrigerator, Water Heater, AC/Heater, Microwave – convection oven, range hood, air fryer combo |
| Appliances Install – Labor | Installation of appliances. Does not include LP gas appliances. LP Gas appliances have additional charges for conversion and hookup – |
| Cabinet – Material | Custom kitchen and storage cabinets |
| Cabinet – Labor | Assemble hardwood cabinets and soft close doors and drawers. Hardware if requested |
| Interior – Material | Shiplap interior |
| Door – Materials | 1 Exterior door, 2 interior doors (swing style doors) |
| Door – Labor | Install and hang doors |
| Countertop – Materials | Solid Surface countertop |
| Countertop – Labor | Fabricate solid surfaces, 45 degree edge, polishing, finish and seal |
| Flooring – Materials | Vinyl Plank Flooring |
| Flooring – Labor | Installation of Vinyl plank flooring throughout house |
| Paint – Materials | Interior and Exterior paint |
| Paint – Labor | Interior and Exterior Paint |
| Interior – Material | Interior trim and molding |
| Interior – Labor | Interior caulking, finish trim and finishes |
| Roofing- Materials | Metal Tuff Rib Roofing, z metal, j metal, drip edge, eves. All metal for Tiny Home |
| Roofing – Labor | Installation of metal roof and drip edges, including custom ordered Z metal band for attaching skirting at bottom of house |
| Siding – Materials | Lap Siding |
| Siding – Labor | Installation of siding, caulking and trim |
| Window – Materials | Windows |
| Window – Labor | Prep window areas, tape windows, caulk, nail flanges, tape and water seal windows before trimming |
| Misc Production Cost | Includes misc hardware, fasteners, MCO, Inspection |